CME Logo Construction & Marine Equipment Co, Inc 908-920-9500
Home About Us Our Services Project Profiles Photo Gallery Contact Us
 
 
Pipe Pile Project

Description: Transferring 90' long 30" diameter piles from truck to barge for delivery to work site, total tonnage 600 ton. The piles were destined for a new floating breakwater to be used for harbor patrol boats at Rikers Island.

Location: Elizabeth, NJ

Customer: Spearin Preston & Burrows

Comments: CME also has experience in transferring heavy equipment, caissons, prefabricated steel, steel and concrete pilings and other construction material arriving by rail onto the facility or by heavy haul trucks.

Print this project Profile (PDF)